Before energising

Four essential stages

Confirm the design

Check voltage windows, current ratings, protection devices, cable sizes, communication and environmental limits.

Inspect installation

Verify mounting, ventilation, clearances, grounding, polarity, torque and isolation before connecting power.

Configure safely

Use the approved parameter set for the battery, inverter, grid standard and intended operating mode.

Record commissioning

Capture serial numbers, firmware, settings, initial readings and acceptance results for future service.

Important

Use the model-specific manual

This page is a general workflow for site planning. It is not a substitute for qualified electrical design, local regulations or the instructions supplied with the installed model.

Open Downloads
Qualified personnelRequired for installation and service
Local codeMust be followed
PPE and isolationUse defined site procedures
RecordsKeep commissioning evidence